Thames Gateway

Due to a design issue the clients requirement was to increase the width of 23 number loading docks to a new distribution warehouse at the London Gateway development. The method was to diamond saw cut vertically through precast concrete panels to a depth of 250mm using hydraulic ring saw to release the section. The high level works needed to be carried out from a MEWP.